How to choose a standby generator size (checklist)

Also see: How to maintain a standby generator.

Homeowners and small-business managers facing a power outage often assume bigger is better. In reality, an oversized standby generator wastes fuel, costs more up front, and may strain your home’s electrical system if not properly matched. This checklist walks you through the practical steps of sizing a residential standby generator, from identifying essential loads to understanding fuel constraints and permit requirements.

Important: This guide is educational only. Always engage a licensed electrician for a NEC Article 220 load calculation. Never backfeed a home panel. A transfer switch (ATS) is required for safe isolation from the grid. Fuel type, gas-meter capacity, and local codes all affect what you can install. Cost bands below are illustrative ranges from secondary contractor sources; they are not quotes.

1. Start with a load inventory

Before requesting quotes, list every circuit or appliance you want to keep running during an outage. Prioritize into tiers:

Must-run (essential for safety and basic living)

Important (comfort and property protection)

Nice-to-run (luxury loads)

2. Seasonal HVAC considerations

Heating and cooling are typically the largest electrical loads in a home. When sizing:

Rule of thumb: Do not size a generator to run the entire home’s HVAC at once unless the electrician confirms the service panel can handle the combined start-up surges. Many homeowners opt to power only the thermostat/blower circuit and use window fans or portable heaters during outages.

3. Fuel type and nameplate rating

A common sizing trap is comparing the propane (LP) headline kW to what you will actually get on utility natural gas (NG). On many air-cooled residential units, the advertised kW is the LP figure; NG output is often roughly 8–12% lower (dealer secondary guides cite examples such as a “22 kW” class unit delivering closer to ~19.5 kW on NG). Always compare the NG column if that is your fuel.

4. Transfer switch type and ATS sizing

A standby generator is useless without a transfer switch (ATS — automatic transfer switch). The ATS isolates the circuits you want to power and switches them from the grid to the generator when an outage occurs.

5. Permits, HOA, and local codes

Standby generator installation is subject to local electrical codes, zoning, and permitting. Requirements vary by municipality and county.

6. Cost bands (illustrative only)

Cost for a turnkey standby generator installation varies widely based on region, generator size, electrical complexity, and fuel infrastructure. The following bands are from secondary contractor sources labeled as illustrative Southeast Florida ranges and should not be taken as quotes:

Never rely on online pricing calculators as final quotes. Get at least one licensed electrician site visit and load calculation before committing.

7. Practical checklist: what to verify before you buy

  1. List must-run loads (refrigerator, well, medical, lighting, sump)
  2. Note seasonal HVAC loads (heating vs. cooling, tonnage, blower motor)
  3. Confirm fuel type (natural-gas line vs. propane tank size and location)
  4. Have gas utility or plumber verify meter capacity for generator load + existing appliances
  5. Obtain NEC Article 220 load calculation from a licensed electrician
  6. Determine ATS type (specific circuits vs. sub-panel)
  7. Check local permit requirements and HOA covenants
  8. Review setback and flood-zone regulations for your property
  9. Get at least two written quotes from licensed contractors after the load calc
  10. Ask about warranty and maintenance plans (refer to manufacturer literature, do not infer claims)

8. Questions to ask your installer

When you meet with a licensed electrician or generator contractor, consider asking:

  1. Can you perform a NEC Article 220 load calculation for my panel, and will you provide a written report?
  2. Which circuits or sub-panel do you recommend for my essential loads, and why?
  3. Will the natural-gas meter and service line support the generator’s fuel demand at full load?
  4. What transfer switch model do you specify, and how is it sized relative to the expected load?
  5. What permits are required in this municipality, and do you handle the application process?
  6. Are there HOA or setback restrictions I should know about before finalizing the unit location?
  7. What is the expected run time at 50% load given my gas supply and tank size (if applicable)?
  8. Do you provide a maintenance schedule or service agreement for the first year?

Sources

  1. Generac sizing guide PDF 2025 (NEC 220.82 / 220.87 framing): https://www.denneyelectricsupply.com/content/Generac_Generator_Sizing_Guide%202025.pdf
  2. Transfer switch quote checklist / NEC 445/700/701/702 framing: https://www.documentorium.com/blog/generator-transfer-switch-quotes-for-electrical-contractors
  3. Generac vs Kohler NG vs LP output trap (secondary dealer): https://www.portlandiaelectric.supply/blogs/energy-solutions/generac-vs-kohler-standby
  4. ATS sizing 2026 guide (secondary): https://www.portlandiaelectric.supply/blogs/brand-guides/transfer-switch-sizing-guide-amps-circuits-ats-vs-manual-2026-pes
  5. South Florida sizing/permit/cost ranges (secondary contractor; label as FL SE example): https://www.trophyelectricllc.com/standby-generator-installation-in-south-florida-sizing-transfer-switches-and-the-2026-permit-process
  6. NFPA 110-2025 load-bank notes (maintenance adjacency, not sizing core)

Affiliate relationships will be disclosed when live. This guide is not tax, legal, or engineering advice. Always consult a licensed professional for your specific situation.